Construction of a new power transmission line with 31.5 mm ACSR conductors with six triple-bundle phases and guard wire with attached optical fibre, galvanised steel pylons and steel tube towers, reinforced concrete plinth foundations and TUBFIX reinforced concrete piles. The total length of the power line is 28.0 km.