In Salbertrand (province of Torino), we were commissioned by AEM Torino to demolished and completely rebuild the Serre la Voute crossing on the Dora Riparia river in Val di Susa (requiring approx. 1,000 cubic metres of reinforced concrete) to feed the downstream power station in Chiomonte (province of Torino).
Completed projects
Select sector or country to refine your search
![The Flero school](https://www.rodaspa.com/wp-content/uploads/2017/09/scuola-di-flero8-150x150.jpg)
![The Maen hydroelectric power station](https://www.rodaspa.com/wp-content/uploads/2017/09/Impianto-di-produzione-MAEN-4-150x150.jpg)
![The Ponti sul Mincio electrical power station](https://www.rodaspa.com/wp-content/uploads/2017/09/Stazione-elettrica-Ponti-sul-Mincio1-150x150.jpg)
![The Legnaro electrical power station](https://www.rodaspa.com/wp-content/uploads/2017/09/Stazione-elettrica-di-Legnaro2-150x150.jpg)
![Castel Madama generation facility – province of Rome](https://www.rodaspa.com/wp-content/uploads/2017/09/Impianto-di-produzione-Castelmadama-RM2-150x150.jpg)
![The Val Gerola cableway](https://www.rodaspa.com/wp-content/uploads/2017/07/stazionePartenza-latoValle-super-150x150.jpg)
![The 380 kV “Ittiri-Codrongianos” power transmission line](https://www.rodaspa.com/wp-content/uploads/2017/09/ittiri-condrogianos4-150x150.jpg)
![The “Piossasco-Venaus” 380 kV power transmission line](https://www.rodaspa.com/wp-content/uploads/2017/09/piossasco-venaus-150x150.jpg)
![380 kV power transmission line from Source to Rizziconi](https://www.rodaspa.com/wp-content/uploads/2017/09/sorgente-rizziconi3-150x150.jpg)
![The “Verderio-Stazzona” 132kV Transmission Power Line L.21](https://www.rodaspa.com/wp-content/uploads/2017/09/verderio-stazzona-150x150.jpg)
![HVDC INTERCONNECTION BETWEEN ITALY AND FRANCE](https://www.rodaspa.com/wp-content/uploads/2017/08/HVDC-ITALIA-FRANCIA2-150x150.jpg)
![SCILLA-VILLAFRANCA DUAL THREE-PHASE SECTION](https://www.rodaspa.com/wp-content/uploads/2017/08/scilla-villafranca2-150x150.jpg)
![MI Ovest [MiIano West] – Baggio](https://www.rodaspa.com/wp-content/uploads/2017/08/mi-ovest-baggio7-150x150.jpg)
![132 kV DT connections for “Parma Vigheffio – S.Quirico” Line no. 607](https://www.rodaspa.com/wp-content/uploads/2017/08/parma-vighelfio-squirico4-150x150.jpg)
132 kV DT connections for “Parma Vigheffio – S.Quirico” Line no. 607
Terna Rete Italia S.p.A.
Continue![380kV “La Spezia-Vignole Borbera” power transmission line](https://www.rodaspa.com/wp-content/uploads/2017/08/SPEZIA-VIGNOLE3-150x150.jpg)
![380kV “Chignolo Po Maleo” power transmission line](https://www.rodaspa.com/wp-content/uploads/2017/08/CHIGNOLO-MALEO5-150x150.jpg)
![380kV “Trino-Lacchiarella” power transmission line](https://www.rodaspa.com/wp-content/uploads/2017/08/TRINO-LACCHIARELLA8-150x150.jpg)
![“Villanova-Gissi” 380 kV power line](https://www.rodaspa.com/wp-content/uploads/2017/08/VILLANOVA-GISSI1-150x150.jpg)
![MON.ITA – Italy Montenegro interconnection](https://www.rodaspa.com/wp-content/uploads/2017/07/montenegro-gallery3-150x150.jpg)