380 kV power transmission line from Source to Rizziconi

Sorgente – Rizziconi (ITALIA)

22/07/2010 - 31/12/2012
Overhead power lines

Construction of a new power transmission line with 31.5 mm ACSR conductors with six triple-bundle phases and guard wire with attached optical fibre, galvanised steel pylons and steel tube towers, plinth foundations, bored piles and TUBFIX reinforced concrete micropiles. The total length of the power transmission line is 16.0 km. The steel tube towers were erected using an ERICKSON helicopter.