Construction of a new power transmission line with 31.5 mm ACSR conductors with six triple-bundle phases and guard wire with attached optical fibre, galvanised steel pylons, steel tube and new ROSENTAL-DUTTON towers, plinth foundations, bored piles and TUBFIX reinforced concrete micropiles. The total length of the power transmission line is 70.0 km. The steel tube towers were erected using an ERICKSON helicopter. Design study of the final assembly and stringing procedures for the new ROSENTAL-DUTTON towers.
Video
Elettrodotto 380kV “Trino-Lacchiarella
Completed projects
Select sector or country to refine your search
![The Flero school](https://www.rodaspa.com/wp-content/uploads/2017/09/scuola-di-flero8-150x150.jpg)
![The Maen hydroelectric power station](https://www.rodaspa.com/wp-content/uploads/2017/09/Impianto-di-produzione-MAEN-4-150x150.jpg)
![The Ponti sul Mincio electrical power station](https://www.rodaspa.com/wp-content/uploads/2017/09/Stazione-elettrica-Ponti-sul-Mincio1-150x150.jpg)
![The Legnaro electrical power station](https://www.rodaspa.com/wp-content/uploads/2017/09/Stazione-elettrica-di-Legnaro2-150x150.jpg)
![Castel Madama generation facility – province of Rome](https://www.rodaspa.com/wp-content/uploads/2017/09/Impianto-di-produzione-Castelmadama-RM2-150x150.jpg)
![The Val Gerola cableway](https://www.rodaspa.com/wp-content/uploads/2017/07/stazionePartenza-latoValle-super-150x150.jpg)
![The 380 kV “Ittiri-Codrongianos” power transmission line](https://www.rodaspa.com/wp-content/uploads/2017/09/ittiri-condrogianos4-150x150.jpg)
![The “Piossasco-Venaus” 380 kV power transmission line](https://www.rodaspa.com/wp-content/uploads/2017/09/piossasco-venaus-150x150.jpg)
![380 kV power transmission line from Source to Rizziconi](https://www.rodaspa.com/wp-content/uploads/2017/09/sorgente-rizziconi3-150x150.jpg)
![The “Verderio-Stazzona” 132kV Transmission Power Line L.21](https://www.rodaspa.com/wp-content/uploads/2017/09/verderio-stazzona-150x150.jpg)
![HVDC INTERCONNECTION BETWEEN ITALY AND FRANCE](https://www.rodaspa.com/wp-content/uploads/2017/08/HVDC-ITALIA-FRANCIA2-150x150.jpg)
![SCILLA-VILLAFRANCA DUAL THREE-PHASE SECTION](https://www.rodaspa.com/wp-content/uploads/2017/08/scilla-villafranca2-150x150.jpg)
![MI Ovest [MiIano West] – Baggio](https://www.rodaspa.com/wp-content/uploads/2017/08/mi-ovest-baggio7-150x150.jpg)
![132 kV DT connections for “Parma Vigheffio – S.Quirico” Line no. 607](https://www.rodaspa.com/wp-content/uploads/2017/08/parma-vighelfio-squirico4-150x150.jpg)
132 kV DT connections for “Parma Vigheffio – S.Quirico” Line no. 607
Terna Rete Italia S.p.A.
Continue![380kV “La Spezia-Vignole Borbera” power transmission line](https://www.rodaspa.com/wp-content/uploads/2017/08/SPEZIA-VIGNOLE3-150x150.jpg)
![380kV “Chignolo Po Maleo” power transmission line](https://www.rodaspa.com/wp-content/uploads/2017/08/CHIGNOLO-MALEO5-150x150.jpg)
![380kV “Trino-Lacchiarella” power transmission line](https://www.rodaspa.com/wp-content/uploads/2017/08/TRINO-LACCHIARELLA8-150x150.jpg)
![“Villanova-Gissi” 380 kV power line](https://www.rodaspa.com/wp-content/uploads/2017/08/VILLANOVA-GISSI1-150x150.jpg)
![MON.ITA – Italy Montenegro interconnection](https://www.rodaspa.com/wp-content/uploads/2017/07/montenegro-gallery3-150x150.jpg)