The “Verderio-Stazzona” 132kV Transmission Power Line L.21

Verderio-Stazzona (Lombardia – ITALIA)

30/07/2015 - 31/12/2016
Overhead power lines

Replacement of the old 14 mm diameter copper conductors with a new ZTACIR aluminum alloy conductors of diameter 16.25 mm in a 52 km section of the 132kV three-phase line connecting the Verderio and Stazzona Power Stations. Execution of foundation reinforcements and replacement of pylon support structural elements.

Completed projects

Select sector or country to refine your search