Upgrade of existing 380 kV, 132 kV, 220 kV power lines at the Piossasco EPS in G.I.S. execution

Piossasco (Piemonte – ITALIA)

02/05/2012 - 25/11/2012
Overhead power lines

Replacement of pylons and modified routing for incoming and outgoing power lines at the Piossasco EPS in G.I.S. execution, in order to upgrade connections to new dead-end towers. This intervention affected all voltage levels and the following.

132 kV Power Transmission Lines:

  • 586 Serene – Piossasco;
  • 587 Piossasco – Airasca;
  • 588 Piossasco – Giaveno;
  • 623 Piossasco – Rivoli;
  • 635 Piossasco – Annovati – Pinerolo nord;
  • 678 Piossasco – Piossasco PSS.

the following 220 kV Power Transmission Lines:

  • T231 Pianezza – Piossasco;
  • 232 Piossasco – Sangone.

the following 380 kV Power Transmission Lines:

  • 316 Leini – Piossasco;
  • 396 Piossasco – Magliano Alpi;
  • 397 Piossasco – Casanova;
  • T398 Venaus – Piossasco.

Completed projects

Select sector or country to refine your search