Construction of 380 kV branch lines from the existing “Matera-Bisaccia” power line to the new Melfi EPS

03/11/2014 - 31/12/2015
Overhead power lines

Construction of the new branch line between the 380kV “Matera-Bisaccia” power line and the new Melfi EPS. The branch line is composed of two parallel underground 380 kV three-phase sections in 31.5 mm diameter ACSR cable with three triple-bundle phases and two Alumoweld guard wire with attached optical fibre, galvanised steel pylons, plinth foundations and TUBFIX reinforced concrete micropiles. The total length of the branch is 5.0 km.

Completed projects